Meridian Property Group 520 Harbor Drive, Suite 400 Charleston, SC 29401 January 14 Ms. Fiona Drucker Luminar Design Studio 520 Harbor Drive, Suite 210 Charleston, SC 29401 Dear Ms. Drucker, I am writing to inform you of significant renovation work that will be carried out in the west wing of the Harbor Drive Tower beginning on March 3. As your office is located in that section, the construction will directly affect your suite for an estimated eight weeks. During this period, we will be replacing the heating and ventilation systems in all west wing units and upgrading the electrical wiring to meet current safety standards. Because the work requires temporarily shutting off power and climate control in individual suites, we are unable to guarantee a comfortable working environment on the affected floors. To minimize disruption to your business, we are offering each west wing tenant a temporary workspace on the fifth floor of our adjacent building at 530 Harbor Drive at no additional cost. The temporary suites are fully furnished and include high-speed Internet access, shared conference rooms, and reception services. You would retain your current lease terms and monthly rate throughout the transition. If you would prefer to remain in your suite during the renovations, please note that noise levels may be considerable between 8:00 A.M. and 5:00 P.M. on weekdays. Please confirm your preference by February 7 so that we may finalize logistics. You can reach my office at (843) 555-0192 or reply to this letter by e-mail at g.whitfield@meridianpg.com. Sincerely, Graham Whitfield Director of Tenant Relations Meridian Property Group
문항 1 / 4
안 푼 문항 4개
What is the main purpose of the letter?
What will the renovation project involve?
What is indicated about the temporary workspace?
What is Ms. Drucker asked to do by February 7?